Lead time
A standard lead time of 15 WD (WD = Working Days) is possible at EPC ELREHA GmbH.
Relevant for the lead time are different factors such as:
- Type of material (if it is special materials)
- Quantity (depending on the size of the circuit board)
- Multilayer (depending on the number of layers)
- Special Specifications (such as Controlled depth routing, blind & buried vias, peelable mask, surfaces)
Quick turn possible - please ask!